Other 1897 to 1899 costs

1897 Work for A.A. Austin
3 hours with horse .60
4 hours with horse .80
half day with horse 1.00
6 hours with horse 1.20
A load coal 1.00

1898 work for A.A. Austin
Feed 2.50
Hay, straw 2.50
Horse half day .50
Horse 6 hours .60
Horse 7 hours .70
Horse one day 1.00
C.M.A. 4 hours .50
C.M.A. 1/2 day .625
Elbert 7 hours .75
C.M.A. 8 hours 1.00
Elbert 9 hours 1.125
Rob Clark 1 day 1.25
Half day, me and horse 1.00
Horse and me 7 hrs. 1.40
With team 3.5 hours 1.05
Team 1/4 day 1.25
Team 3/4 day 2.25
Team one day 3.00
Lumber 18.00
Team half day 1.50

1898 Work for W.B. Styles
One trip to Shohola 1.25
Water from Shohola .56
1 stove from Shohola 1.50
Road work 4.00

1899 Costs
Bridge toll .40
Half day work .625
A man to help .70
Team 1/4 day .75
7 hours .875
Half day with horse 1.00
8 hours 1.00
1 day work 1.25
Half day with team 1.50
Team of 7 hours 2.10
Trunks from Shohola 1.00
Road work 3.00
One load from Shohola 1.50
To Shohola for chickens 1.00
Trunk from Shohola 1.00
Trim trees, planting 12.00

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *